Municipal Consent (MC) applications shall include the following:
- A cover letter stating:
- The applicants name, associated organization and contact information;
- the name of the company for which the work is being completed and their corresponding Work Order number;
- a summary of the proposed work, including a description and location;
- the estimated commencement and completion dates, and;
- any required explanation(s) for design decisions which may deviate from the Counties’ design and installation guidelines.
- A complete drawing package where the proposed design shall conform to the UCLG Design and Installation Guidelines for Proposed Utility Ducts, Pedestals, and Poles within the R.O.W and the drawings themselves shall contain all relevant landmarks and offset information.
- Pictures of the proposed site – staked out and offsets shown. (Optional but can be requested at the Counties’ discretion.)
Please review the UCLG MC Submission and Drawing Requirements.
Upon the Counties’ review, a Permit Number will be issued which will be required for Step 2: Applying for a Road Occupancy and Access Permit.