Construction Projects

Preliminary Road Projects 2017 

Rideau Lakes

  • Cty Rd 1 - Lombardy Bridge Rehabilitation
  • Cty Rd 36 - Reconstruction from 6 km North of Westport to Lanark County Border

Elizabethtown-Kitley

  • Cty Rd 6 - Rehabilitation 100 m north of Gosford Rd to E-K/Augusta border, 4.4 km
  • Cty Rd 16 - Microsurface 380 east of Rd 7 to Via Tracks, 5.2 km
  • Cty Rd 27 - Reconstruction  Rd 46 to St George St stormsewer, 0.3 km
  • Cty Rd 27 - Lyn Creek Bridge

Leeds and The Thousand Islands

  • Cty Rd 2 - Leeds and the Thousand Islands west of Lansdowne - Culvert replacements
  • Cty Rd 3  - Reconstruction at Cty Rd 34 Intersection
  • Cty Rd 33 - Lyndhurst Bridge - Rd 33
  • Cty Rd 34 - Microsurface from 360 m east of Bradley Lane to Kyes Rd, 2.3 km

Front of Yonge

  • Cty Rd 5 - Reconstruction Cty Rd 2 Intersection, 0.1 km - Intersection Redesign

Augusta

  • Cty Rd 6 - Rehabilitation from E-K/Augusta border  to west limit of North Augusta, 1.4 km
  • Cty Rd 18 - O'Hagen Bridge Rehabilitation
  • Cty Rd 26 - Robinson Creek Culvert Replacement
  • Cty Rd 31 - Surface treatment from North limit of 401 Overpass to Rd 26, 2.0 km
  • Cty Rd 31 - Microsurface from Rd 2 to north limit of 401 Overpass, 2.0 km

Edwardsburgh-Cardinal

  • Cty Rd 2 - Cold-In-Place rehabilitation Johnstown 340 m west of Blair Rd, 5.8 km
  • Cty Rd 21 - Microsurface from Rd 22 to SD&G Boundary, 2.5 km

North Grenville

  • Cty Rd 18 - Microsurface from Rd 20 to 300 meters north of McFarlane Rd, 3.2 km
  • Cty Rd 18 - Lackie Culvert replacement
  • Cty Rd 18 - Hanlan Bridge rehabilitation
  • Cty Rd 20 - Microsurface from Rd 22 to SD&G Border, 2.6 km
  • Cty Rd 20 - Surface treatment from Renders Bridge to north limit of East Oxford, 3.5 km
  • Cty Rd 43 - Mill and resurface Sommerville Rd to Cty Rd 44, 0.95 km

 Glossary of Pavement Maintenance

 

Rehabilitation - Involves the removal or recycling of an existing pavement and placing of new pavement surface course. Normally includes replacement of culverts and repairs or replacement of concrete curbs, sidewalk and drainage structures. Granular base material may be added depending on the process selected.

Resurfacing - Failing areas are patched and roadway is resurfaced with new hot mix asphalt. May also include repairs to concrete curb, sidewalk and drainage structures.

Microsurfacing - An unheated mixture of polymer modified asphalt emulsion, high-quality frictional aggregate, mineral filler, water and other additives are mixed and uniformly spread over the pavement surface as a slurry.

Surface Treatment - Failing areas are patched and an application of asphalt emulsion and aggregate chips are spread and rolled onto the roadway. New this year, a fog seal will be applied to seal the aggregate in place, leaving a solid, black driving surface.

Cold-In-Place Recycling - Reprocesses existing pavements to a depth of 100 mm to produce a sound base pavement structure which is then resurfaced with new asphalt.

 